Contract Management

How to create a call off using Housetype selection

Before starting a call off checking and preparing the handover documents will save time, this ensures you have the relevant information to enter Rtis. Below are a few contact suggestions for missing information

If you have any doubt about information or products, please DO NOT guess ask for help

Creating a call off

Open the contract the call off is to be created in

1.

Ensure the call off summary tab is selected

2.

Select create call off tab complete the following columns

3.

Call off is generated make a note of the call off number

4.

Change Spec Status to in process

5.

Change Manufacture site to your site/site goods to be manufactured

6.

Add description that is unique to this call off adding your initials in brackets e.g., (TT)

7.

Select the correct COC for the call off (this will be FSC/PEFC for all except Grangemouth as no certification in place now)

8.

Enter the lead times by selecting the correct date in the Production week column

Individual site will have different lead times these will be agreed, and rules set up in Rtis to reflect these

9.

Change the admin Status to Processing

10.

Select in the Cust. Order No column the correct PO

11.

Enter the value of any carriage charge

12.

If this calls off has a requested alternative delivery address complete this field refer to the full process steps in this link 46-How to Add an Alternative Address v1.1.docx

13.

Only select the FOC button if you are authorised by management that this call off is FOC

Save

Add the doorset/door /frame requirements

14.

Select House type management tab

Select add a house type this generates a blank house type

  1. Replace (new house type) with the actual house type name
  1. Replace (new plot) with plot number /name
  1. As/opp this is reference the handing the first plot is known as the AS ( as the drawings) subsequent plots are to be selected as per customers’ requirements for the plot select here from the customers drawings
  1. Call off column will be populated once this plot is assigned to a call off
  1. Desp. Column give the despatch status of the call off
15.

Select the Add new DS tab

Door set Specification window now opens ready to input the specification required by customer – complete all relevant fields starting at the top

16.

Doorset selector section here select either doorset or door/frame and enter the pricing details from the handover document

17.

General Specification – complete all fields as per the handover document

18.

Doorset Notes This is where you can add your already set up notes into the doorset. This link is to the process document How to add a note to doorset spec v1.docx

19.

Bespoke = Is a special Door manufactured in Thornaby

20.

Product Range = Catalogue door from supplier i.e., Vicaima /Premdor

  • Service option – are standard options that supplier offers
20.

Select the next to service options to make selections here

21.

Bought in Bespoke = is a way to buy from a third party (only to be used in exception when Inteldoors cannot fulfil the requirements)

22.

Apertures – glazing

23.

Frame Specification – In this section the intumescent strip information is displayed changes to colours are made here

24.

Frame Comps and Arch Comps tabs – check correct entries pulled through amend any requirements as per the handover document

25.

Ironmongery – here selection is made from the earlier set up of the ironmongery.

A reminder of how to set this up follow this link How to set up Ironmongery.docx

26.

Additional ironmongery can be added by selecting the add iron item/add iron pack

A select add iron item

B select the to add

27.

By selecting the spy glass and the drawing, images can be viewed of what the doorset will look like

28.

The Valid warning at the top of the doorset starts off as Red and it should turn to green upon completion of the doorset, if still red select the warning this will open a new window

29.

This new window will detail what is causing the warning to still be red, these needs investigating and resolving before proceeding

30.

Once the valid/invalid warning is green, select the view material requirements tab this will go dark grey whilst Rtis checks all requirements, this can take a few minutes as the systems checks the call off

31.

When complete a new window opens any unspecified items will be highlighted in yellow, these need to be addressed before proceeding

Once the first doorset has been created house type management has several features these features, and tabs are explained below

32.
  1. Add House Type – select this to add a housetype
  1. Duplicate HT – by selecting this tab the house type will duplicate
  1. Duplicate HT from order – this will duplicate a house type from a different call off see steps 33-39
  1. Delete HT – this will delete the selected House Type
  1. Add Plot – adds plots to the selected house type
  1. Delete a plot- this will delete the plot selected
  1. Add new doorset - by selecting this tab a new doorset will be added
  1. Duplicate a door set – when this tab is selected it will duplicate the doorset
  1. Delete a doorset -if required

Duplicate HT from order

33.

Note the contract number and call off number to be duplicated

34.

Select the duplicate HT from order tab

35.

From the contract No field select the drop-down arrow

36.

This opens new window - search here for the contact and select open

37.

This then populates all the call offs into the scree

38.

Locate the call off required and click on the select grey button

39.

This then add this housetype to your current contract

Assign to a call off

40.

Select contract details tab

41.

Select call off assigner new window opens

42.

Select the doors/frames to be assigned by ticking the box in column select door select frame

43.

Choose the call off to be assigned to

44.

Items to be assigned will be highlighted in red in the tab check this is correct and select to assign to call off

45.

This will now turn green showing the call off number and appear in the lower window

46.

Close window takes you back to contract details

How to produce schedule to send to the customer

47.

Select the drop-down arrow from the selected call offs

48.

A. Select the call off

B. Select ok

Window closes

49.
  1. Check the selected call off is correct
  1. Select print,
  1. select the correct required schedule dependant on what is on the call off this will generate the schedule ready to send to customer
50.
  1. select load template
  1. select create schedule
  1. select Save as Excel this document and tidy up before sending to the customer for approval
51.

Once the customer has confirmed the schedule is correct proceed to committing the call off

How to commit

52.

Change spec status to complete in the call offline

53.

Select FSC update this will check all the material requirements this can take a few minutes

54.

The commit button will now be active select this it will go dark grey whilst it processes to committed. Message appears to confirm committed

55.

Call offline is now a darker grey and no further changes can be made commit tab changes to being greyed out

56.

Select the in the purchasing status, new window opens

57.

Click on the

  1. click on the select all tab,
  1. then select the regenerate selected tab,
  1. message appears are you sure you want to recreate the purchase requirements click OK
  1. message will appear update completed
  1. select ok
58.

Now release the paperwork for printing by clicking in the revision No column and release paperwork

59.

Admin status change to released to purchasing

60.

Spec status change to complete

61.

Save

Check and review the Sales Doorset checking list (intel) pack paperwork

62.

From the call off line

  1. select the printer icon
  1. select Sales doorset checking list (intel) from the pre-sets drop down
  1. select print reports
  1. paperwork pack appears, view this here checking what you have entered is all appearing correctly on the pack