Procurement

How to Raise a PO for non managed stock

In Rtis

Menu selected → Procurement → Topic from within Menu → Purchase Summary

1.

Filter the Manu. Site to Grangemouth

2.

Enter call off number in the call off search box

3.

Working from left to right select each of the Timber fields and review requirements

4.

Double click in each field

5.

This opens new window

6.

View this window if no stock to view in here tick the box in the top right-hand corner next to Not Req

7.

Status auto populates to Not Required

8.

Select save and exit

9.

Window now closed and returns to purchase summary

10.

When a field selected has stock requirements purchaser then reviews the stock and decides if this item is from stock or is to be purchased, if from stock select all from stock if to be purchased select not from stock

11.

All timber will be ordered from the mill the selection here is not from stock

12.

update the status to PO placed this is selected from the drop down

13.

Comments can be added into the comments box which is a free text box

14.

Save and exit making a note of the call off number

15.

Window closes and returns to purchase summary

16.

When a goods needs to be order select MRP console Grangemouth from procurement menu

17.

This opens a new window

18.

Select Timber from drop down next to material group

19.

Select create new PO take note of the number

20.

Select the category from the dropdown arrow i.e., hardwood

21.

Select supplier from drop down this opens new window

22.

Search for Thornbridge sawmill click on the

23.

Select the material requirements tab

24.

Select pick call off tab

25.

New window opens search for call off and select

26.

This pulls through the material requirements

27.

View the requirements

28.

If all are required select the set all Bal qty to order

29.

Select process to PO tab

30.

Click OK

31.

Select the PO with the number you made note of in step 20

32.

Select sub date this is the date PO created

33.

In the delivery address/call off box select the call off tab enter the date the timber is required, this populated the req date filed

34.

Tick the fax sent box this confirms PO /cutting list issued to the mill

35.

Select the instructions/notes tab to add any comments required to communicate to the mill these will show on the PO only not the cutting list

36.

Select the mill requirements tab

37.

This opens new window select print frame cutting this then generates the cutting list

38.

Select the printer icon select the correct printer and print

39.

A pink and yellow copy of the cutting lists is also required using coloured paper already in stock print these copies ready to take to the mill

40.

Select the print tab this generates the PO this can either be emailed to the mill or printed and taken across to the mill office when the cutting list goes over

41.

Save and exit

42.

When you return to the purchase summary and click in a different field your field will be updated with PO number and turn orange until the goods arrive and have been booked in